J-PARC MR beam simulations
- B. Yee-Rendon
- Feb 14, 2016
- 1 min read
The Japan Proton Accelerator Complex (J-PARC) is integrated by a set of high intensity proton accelerators. At this operation level, the monitoring and control of the beam losses and residual radiation are priority for its safe performance and maintenance. At Main Ring (MR), a discrepancy appears between the beam loss signal detected by the monitors and the residual dose measured. To understand this difference and the mechanism that produces these losses, a beam simulation study is implemented using the Strategic Accelerator Design (SAD) and Geometry and Tracking (Geant4) code.

Recent Posts
See AllCurrently, I am a Postdoctoral Fellow at The High Energy Accelerator Research Organization (KEK) from 2015 to 2017. #httpvimeocom38805205
Comments